Industrial Electrical Engineering · Tijuana, Baja California

Industrial Power
for Maquiladoras
in Tijuana

Us Tech designs medium/low-voltage substations, arc flash studies, UVIE certifications, and NFPA 110 emergency power systems for FDA-regulated and industrial OEMs in Tijuana. Dual-code NOM-001-SEDE 2012 + NEC 2023. Since 1990.

View Case Study
Industrial electrical substation maquiladora Tijuana — Us Tech Ingenieros
35+
Years Electrical Experience
1st
UVIE Approval Rate
2-Code
NOM-001-SEDE + NEC 2023
0
Production Losses Post-EPSS
Dual-Code Compliance · Mexico + USA

NOM-001-SEDE 2012 vs NEC 2023

Maquiladoras answer to two electrical codes simultaneously — the Mexican standard for CFE service and UVIE certification, and the US standard for OEM parent company auditors. We document both in a single technical file.

Item NOM-001-SEDE 2012 (Mexico) NEC 2023 (USA) Us Tech Approach
Authority DGIEM · CFE · UVIE AHJ · NFPA · UL Most restrictive criterion applied at each design point
Conductor Sizing mm² cross-section AWG gauge Parallel tables delivered: mm² for UVIE, AWG for US audit
Grounding Electrode system per NOM Sec. 2.50 NEC Art. 250 Single-point ground design satisfying both norms
Arc Flash Referenced via NFPA 70E in NOM NFPA 70E · IEEE 1584-2018 IEEE 1584-2018 study with NFPA 70E PPE categories on all labels
Emergency Power NOM-001-SEDE Sec. 7 references NFPA 110 · NEC Art. 700/702 NFPA 110 Level 1 design with NOM-001-SEDE documentation
Service Approval UVIE dictamen → CFE service AHJ permit → utility connection UVIE coordination managed end-to-end by Us Tech
Scope of Work · End-to-End Delivery

Industrial Power Services for Maquiladoras

From initial load study through CFE commissioning and UVIE certification — Us Tech manages the complete electrical scope under a single contract.

01
Load Study & Power Expansion Engineering

Steady-state load analysis, motor-start kVA study, power factor correction, and CFE service sizing for current and projected production capacity. Starting point for all expansion projects.

NOM-001-SEDE · IEC 60038
02
Medium/Low Voltage Substation Design

Complete MT/BT substation engineering: transformer selection, primary and secondary switchgear, busduct, metering, and protective relay coordination. CFE-compliant connection design included.

NOM-001-SEDE · NEC 2023
03
Arc Flash Study — IEEE 1584-2018

Incident energy calculations at all system nodes (switchgear, MCCs, panelboards), NFPA 70E PPE category assignment, arc flash boundary determination, and equipment label set. Required for UVIE approval.

IEEE 1584-2018 · NFPA 70E
04
UVIE Certification Management

Complete management of the 5-step UVIE process: engineering package preparation, inspection scheduling, deficiency resolution, dictamen coordination, and CFE service liaison. Target: first-attempt approval.

NOM-001-SEDE · DGIEM
05
EPSS Emergency Power — NFPA 110 Level 1

Generator sizing (kW steady-state + kVA motor start + 25% service factor), automatic transfer switch (≤10 s transfer), fuel tank sizing, SCADA monitoring, and FDA-ready commissioning documentation.

NFPA 110 · NFPA 99 · NEC Art. 700
06
Construction & Commissioning

Installation supervision, acceptance testing, protective relay coordination testing, ATS transfer time measurement, and final as-built documentation for both NOM-001-SEDE and NEC 2023 compliance records.

NOM-001-SEDE · NEC 2023 · UL 1008
UVIE Certification · 5-Step Process

How We Get Your UVIE Approved on the First Attempt

Most UVIE failures occur at Step 3 — the physical inspection — due to documentation gaps and installation deficiencies identified on-site. Us Tech pre-validates against the UVIE checklist before scheduling inspection.

01
Engineering Package

Complete NOM-001-SEDE design drawings, load calculations, arc flash study, and equipment specs per UVIE submission format.

Wk 1–4
02
UVIE Application

Submission to accredited UVIE body with full documentation package. Us Tech manages the submission and all follow-up communications.

Wk 4–5
03
Physical Inspection

On-site inspection by UVIE verifier. Us Tech accompanies the inspector to address technical questions and present documentation in real time.

Wk 6–10
04
Favorable Dictamen

UVIE issues the compliance certificate. Us Tech reviews the dictamen for scope and accuracy before it is submitted to CFE.

Wk 10–12
05
CFE Interconnection

UVIE dictamen submitted to CFE for service authorization. Us Tech coordinates CFE interconnection works and final energization.

Wk 12–18
Case Study · Silo B Proof · El Lago, Tijuana

1,500 → 2,800 kVA Expansion: Medical Device OEM, Zero Unplanned Downtime

+87%
Installed Capacity
1st
UVIE Attempt
0
Unplanned Downtime

Orthopedic medical device OEM expanded from 1,500 to 2,800 kVA (+87%) in 22 weeks without a single unplanned production stop. Arc flash category reduced from Cat 3 to Cat 1 (IEEE 1584-2018). UVIE favorable dictamen on first inspection.

Read Full Case Study →
View EPSS Case Study
Frequently Asked Questions

Common Questions from OEM Engineering & Facilities Teams

What is UVIE and why does my maquiladora need it? +
UVIE (Unidad Verificadora de Instalaciones Eléctricas) is the Mexican government-accredited inspection body that certifies electrical installations comply with NOM-001-SEDE 2012. Without a favorable UVIE dictamen, CFE will not provide primary electrical service — no service, no production. Any maquiladora requiring a new connection, expansion, or change-of-use must obtain UVIE certification.
Does Us Tech handle both NOM-001-SEDE (Mexico) and NEC 2023 (US) compliance? +
Yes — dual-code compliance is our standard practice for maquiladora projects. NOM-001-SEDE governs the Mexican regulatory process (CFE, UVIE); NEC 2023 satisfies US parent company auditors and OEM engineering standards. We deliver a single technical file with parallel documentation for both codes, eliminating the need for separate design packages.
What does an arc flash study involve and how long does it take? +
An arc flash study per IEEE 1584-2018 models the incident energy (cal/cm²) at every switchgear, MCC, and panelboard in your facility to assign NFPA 70E PPE categories. For a typical maquiladora, the study takes 3–5 weeks. It is required for UVIE certification and forms the basis of arc flash warning labels on all equipment. Us Tech delivers the study, labels, and updated electrical one-line as a complete package.
When does an FDA-regulated maquiladora need an emergency power system (EPSS)? +
NFPA 110 Level 1 emergency power is required when life-safety or product-integrity critical loads (NFPA 99 Class 1) would be interrupted by a CFE outage — typical for clean room HVAC, UPS systems protecting in-process product, or environmental control systems in FDA-regulated processes. Facilities that have experienced production losses due to outages typically recover the EPSS investment within 12 months of installation.
How long does a CFE power expansion take for a growing maquiladora? +
Primary service expansions requiring new CFE interconnection run 14–20 weeks: engineering + UVIE package (4–6 wk), UVIE inspection and dictamen (4–6 wk), CFE interconnection works and energization (4–8 wk). Us Tech coordinates all phases — including UVIE scheduling, CFE liaison, and construction supervision — under a single contract to minimize the total timeline.
Related Resources

Go Deeper on Industrial Power Engineering

GUIDE · UVIE PROCESS
UVIE: Complete Guide to Mandatory Electrical Certification for Maquiladoras
5-step process with document checklists, 8 scenarios requiring UVIE, and 6-deficiency table with fixes.
GUIDE · IEEE 1584
Arc Flash Study IEEE 1584-2018: Protocol for Maquiladora Installations
3-electrode methodology, incident energy calculation, NFPA 70E PPE categories, and UVIE approval workflow.
REFERENCE · DUAL CODE
NOM-001-SEDE 2012 vs NEC 2023: Compliance Guide for Maquiladoras
Conductor sizing comparison (mm² vs AWG), Mexico-US regulatory hierarchy, and common maquiladora installation errors.
Ready to Start?

Tell Us About Your Power Project

Send us your current installed capacity, expansion target, and timeline. A Senior Electrical Engineer will respond within 48 hours with a scope and preliminary assessment.

WhatsApp Us

+52 664 666 8028 · +52 664 119 0814 · info@us-tech.com.mx